Mishimoto - MMCLAMP-325T Stainless Steel Constant Tension T-Bolt Clamp, 3.25

Mishimoto - MMCLAMP-325T Stainless Steel Constant Tension T-Bolt Clamp, 3.25

3.11"-3.43" / Stainless Steel
$11.95
Skip to product information
Mishimoto - MMCLAMP-325T Stainless Steel Constant Tension T-Bolt Clamp, 3.25

Prices and availability are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

We make things that work better and last longer. Our products solve real problems with clean design and honest materials.

Mishimoto - MMCLAMP-325T Stainless Steel Constant Tension T-Bolt Clamp, 3.25

$11.95
Size
Color


Prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply to the purchase of this product.

High-powered turbocharged vehicles need an air-charge system that can handle the demands of extreme heat and pressure. Failing clamps and blown boots are aggravating problems that can result in the end to a day at the drag strip or a delayed weekend trip. Mishimoto constant tension T-bolt clamps are constructed of 100 percent stainless steel and provide the reliability and durability, need to keep the vehicle on the road and out of the shop. These clamps are spring loaded to provide strong and consistent holding power. Mishimoto engineered these heavy-duty clamps to compensate for thermal expansion and to provide peace of mind for even the most extreme pressures. The Mishimoto constant tension T-bolt clamps are available in a variety of sizes from 2.5 inches to 4 inches. These clamps feature an etched 'M' logo and are backed by the lifetime warranty.

  • Stainless steel construction resists corrosion
  • Spring loaded for consistent holding power
  • Locking nut keeps clamp from loosening
  • More durable than traditional worm clamps
  • Mishimoto Lifetime Warranty

We make things that work better and last longer. Our products solve real problems with clean design and honest materials.

You may also like