Skip to product information
Prices and availability are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.
We make things that work better and last longer. Our products solve real problems with clean design and honest materials.
Mishimoto - MMCP-22525BK 2.25" to 2.5" Silicone Transition Coupler, Black
$11.95
Prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply to the purchase of this product.
Mishimoto has developed a silicone transition coupler that measures 2.25" to 2.5".Available in black, blue, red, green, purple and white.
- Length: 3.0” Thickness: 4mm ID: 2.25” OD: 2.5” ID: 2.55” OD: 2.8”
- 100% silicone construction
- Heat-resistant embedded fibers
- High heat and pressure tolerances
- Mishimoto Lifetime Warranty
| Size | 2.25 Inches to 2.5 Inches |
| Material | Silicone |
| Brand | Mishimoto |
| Color | Black |
| Item dimensions L x W x H | 2.54 x 5.08 x 7.62 inches |
| Connector Type | Coupling |
| Exterior Finish | Per Item Description |
| Item Weight | 0.04 kg |
| Number of Pieces | 1 |
| Number of Packs | 1 |
We make things that work better and last longer. Our products solve real problems with clean design and honest materials.